James Hehir Building

This £21m building is home to specialist teaching facilities, as well as general teaching and study space.

The James Hehir Building is a six storey, 4013m building which is a few minutes walk from the main Waterfront Building.

  • Completed within budget at £21m and to the timescale of 18 months
  • Stands at six storeys and 4013m
  • Specialist Life Sciences teaching and research facility
  • Biotechnology unit, cell culture labs and industry-standard microscope suite
  • Ten fully-equipped dental surgery units providing a teaching environment for student dental hygienists and therapists
  • Home to the student bar, Mix

Take a tour of the James Hehir building

Looking up at the James Hehir Building